OVERVIEW

ADComms delivered a £2.4m critical power renewal programme for Network Rail across the Sussex Fixed Telecommunications Network (FTN), replacing life-expired DC power infrastructure at REB, TEH and IFR sites.

Delivered under the PACE framework, the project included the renewal of the Three Bridges FTN Core Node, a key telecommunications hub supporting FTN, GSM-R and operational telephony services.

Project Main Image

SCOPE OF WORKS

ADComms provided a full turnkey solution, including:

  • bullet

    Detailed design and engineering assurance

  • bullet

    Replacement of DCPSUs, rectifiers and battery systems

  • bullet

    Installation of a resilient 16kW Eltek Flatpack 2 DC power system with N+1 redundancy

  • bullet

    Implementation of temporary power systems to support live service migration

  • bullet

    Alarm monitoring integration and testing

  • bullet

    Commissioning, handover and asset documentation

CHALLENGES

The primary challenge was replacing critical power infrastructure without disrupting live railway telecommunications services. With FTN, GSM-R and safety-critical telephony systems remaining operational throughout the works, ADComms designed and deployed a temporary resilient power solution to support migration activities.

A further challenge involved the integration of alarms on an ageing MXOne telephony switch supporting more than 1,500 operational telephone circuits. ADComms developed and implemented a bespoke methodology that allowed works to proceed without interrupting service.

KEY HIGHLIGHTS

  • bullet

    £2.4m Network Rail critical power renewal programme

  • bullet

    Resilient 16kW DCPSU installed at Three Bridges FTN Core Node

  • bullet

    Temporary power solution enabling live migration with no service disruption

  • bullet

    Protection of more than 1,500 safety-critical telephone circuits

  • bullet

    Full compliance with Network Rail engineering and assurance requirements

  • bullet

    Zero lost-time incidents and zero operational disruption

Project Main Image

OUTCOME

The project successfully modernised critical telecoms power infrastructure while maintaining uninterrupted service across FTN, GSM-R and operational telephony networks. Through innovative engineering, robust assurance and careful planning, ADComms delivered the renewals with zero downtime.

The quality of delivery was recognised by Network Rail with a Route to Gold Award, with the Three Bridges Core Node achieving the highest assessment score in the Southern Region during 2025.